Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Ahmad, A G B (1994) Conservation of British colonial buildings built between 1800 and 1930 in Malaysia, Unpublished PhD Thesis, , University of Sheffield.

Ahmed, A L (2019) Development of conceptual constructs for organisational BIM adoption and their systematic application within the UK architecture sector, Unpublished PhD Thesis, School of Architecture, University of Sheffield.

Al-Sedairy, S (1984) Large scale projects: management, design and execution, Unpublished PhD Thesis, School of Architecture, University of Sheffield.

Al-Wareh, M (1979) Investigation of the design procedures for buildings of quality in modern architecture, with notes on the relevant contemporary situation in Syria, Unpublished PhD Thesis, , University of Sheffield.

Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza, Unpublished PhD Thesis, , University of Sheffield.

  • Type: Thesis
  • Keywords: complexity; design cost; e-tendering; flexibility; government; infrastructure project; municipality; participation; partnership; policy; private sector; public infrastructure; tendering; interview; Brazil
  • ISBN/ISSN:
  • URL: http://etheses.whiterose.ac.uk/5255/
  • Abstract:
    There are strong indications that Public-Private Partnership (PPP) will remain the preferred policy tool for provision of infrastructure development in Brazil, involving private sector participation in the design, construction and operation stages of public infrastructure projects. For PPP project formulation, governments in Brazil have increasingly relied on the Procedure for Request of Interest (PRI), in which project design costs are transferred to the private sector, and actors engage in informal pre-tendering interactions since no formal contract binds them in the process. However, many PRI cases are still struggling to complete the pre-tendering stage or have failed entirely, and there is evidence indicating problems with the elements currently used to arrange PPP formulation processes. This research, therefore, was undertaken to explore why many cases are not finishing the PRI pre-tendering process by unpacking the unclear workings of actor-relations at this stage. Since the PRI process highly depends on interactions, this research explored the dynamics of actor-relations in the formulation of an infrastructure PPP project that used the PRI mechanism and completed the pre-tendering stage in the municipality of Fortaleza. From an institutional perspective and using a qualitative approach based on 34 interviews as primary data collection method, this research focused on the adjustments in practices and perceptions, as well as on the institutional framework influencing the process. The findings indicate that many PRI cases have not been successful because the policy instrument largely focuses on structures and neglects the intrinsic and socially constructed elements of the process. The findings also indicate that the PRI formulation of infrastructure PPP projects requires a balance between formal and informal elements, between structures and internally developed “soft” control mechanisms and between guidance and strategic flexibility, as well as the recognition of the complexity involved and the contextual embeddedness of actor-relations for PPP formulation.

Belhadj, T A (1989) Computer-aided architectural evaluation and design: a cost modelling experiment, Unpublished PhD Thesis, School of Architecture, University of Sheffield.

Brocklesby, M (1999) The environmental impact of frame materials: an assessment of the embodied impacts for building frames in the UK construction industry, Unpublished PhD Thesis, Department of Civil and Structural Engineering, University of Sheffield.

Buckman, A H (2016) An exploration of the applications of increased information availability in smart buildings, Unpublished PhD Thesis, , University of Sheffield.

Butchers, A M (2004) Learning off the job: engineers and professional education, Unpublished PhD Thesis, , University of Sheffield.

Densley Tingley, D (2013) Design for deconstruction: an appraisal, Unpublished PhD Thesis, , University of Sheffield.

Donohoe, S W (2008) Can surveying and construction management undergraduate sudents' attitudes to construction law be changed by changes in teaching?, Unpublished PhD Thesis, , University of Sheffield.

Eccles, S D (2000) Quantitative evaluation of contract strategies for construction, Unpublished PhD Thesis, Department of Civil and Structural Engineering, University of Sheffield.

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach, Unpublished PhD Thesis, School of Architecture, University of Sheffield.

Gillott, C (2022) Potential for the vertical extension of existing buildings, Unpublished PhD Thesis, , University of Sheffield.

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century, Unpublished PhD Thesis, , University of Sheffield.

Hamed, O (2022) Developing a BIM-based tool to automate green buildings assessment: the case of Jordan Green Building Guide, Unpublished PhD Thesis, , University of Sheffield.

Hughes, A J (2022) On risk-based decision-making for structural health monitoring, Unpublished PhD Thesis, , University of Sheffield.

Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico, Unpublished PhD Thesis, , University of Sheffield.

Jiang, H (2019) An institutional analysis of the green housing transition in China: examining developers' capacity to deliver green housing in the Chinese housing market, Unpublished PhD Thesis, Department of Urban Studies and Planning, University of Sheffield.

Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry, Unpublished PhD Thesis, Information School, University of Sheffield.

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study, Unpublished PhD Thesis, Management School, University of Sheffield.

Nguyen, B K (2012) Developing a framework for assessing sustainability of tall-building projects, Unpublished PhD Thesis, , University of Sheffield.

Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation, Unpublished PhD Thesis, Management School, University of Sheffield.

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes, Unpublished PhD Thesis, , University of Sheffield.

Price, D A (2003) Community involvement in the design of social housing, Unpublished PhD Thesis, Department of Town and Regional Planning, University of Sheffield.

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers, Unpublished PhD Thesis, School of Architecture, University of Sheffield.

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems, Unpublished PhD Thesis, Department of Automatic Control and Systems Engineering, University of Sheffield.